services
portfolio
about us
recognition
community
South Bend Regional Airport Terminal Expansion

Plans are underway to expand Concourse A. The new 45,000 s.f. concourse expansion will include 5 new gates, dining room, lounge and gift shop and a children’s room. This much-needed renovation will also consolidate passenger screening operations to a single expanded location. The expansion will extend from the east side of the Concourse A Holding Room past the existing Concourse C walkway, which will be demolished. An arching translucent panel roof will provide bright daylight and large windows share a clear view of ramp and runway operations. The Dining Room and Lounge will feature deli meals, snacks and drinks similar to the existing airport services as well as beverages and snacks already screened to take along on outbound flights.

Construction is scheduled to begin in fall of 2009 and conclude in fall 2011. Construction will take place in several phases to allow uninterrupted operation of all airport flights.

Project Location: South Bend, Indiana

download pdf

Previous Project | Portfolio Home | Next Project

projectImage